In 1998 - 2009 AMELIN Group's engineers designed and commissioned more than 30 projects in different industries in Russia and CIS.
Belgorod Region, food industry, steam boiler plant - 9.4 t/h, composed of two SGVC-300 stem generators, 4.7 t/h (20 atm gauge @ 210˚C)
In detail →
Republic of Tatarstan, oil and gas industry, heavy crude oil extraction - steam (modular) boiler plant - 22 t/h, composed of four SGVC-350 steam generators, 5.5 t/h each (22 atm @ 220˚C)
In detail →
Khanty-Mansi Autonomous Area - oil processing, upgrade project of a 4.6 t/h steam boiler plant; replacement of obsolete and worn out boilers with SGVC-150, 2.3 t/h each (8 atm gauge @ 160˚C), associated petroleum gas-fired.
In detail →
Republic of Bashkiria, oil processing, steam boiler plant construction project - 18.8 t/h, composed of twp SGVC-600 steam generators, 9.4 t/h each (32 atm gauge @ 240˚C), natural gas-fired.
In detail →